Plans are underway to build a separated bike/pedestrian path on the upper deck of the Richmond-San Rafael Bridge. As part of a four-year Metropolitan Transportation Authority (MTC) pilot project, the shoulders on the upper and lower decks of the bridge will be converted to a bike/pedestrian path and a traffic lane, respectively.
The bike/pedestrian path is slated to be 10 feet wide, separated from vehicles by either a movable barrier or temporary concrete walls, and include a raised approach on the bridge’s east side. In addition to the new bridge path, transportation officials plan to build a bike/pedestrian trail connecting the bridge and Richmond to Point Molate.
If all goes according to plan, the bike/pedestrian path will be completed in the fall of 2017. Once complete, the new path will fill a major gap in the Bay Trail.