TRANSPAC Tour of the 4th Bore Construction Posted on October 18, 2010 October 14, 2010. TRANSPAC, along with 511 Contra Costa staff got a glimpse of the Caldecott Tunnel fourth bore construction site. Thus far they have drilled a hole 151 feet deep. Here are some pictures that we took along the tour: