Posts Tagged "BATA"

Screen Shot 2015-04-14 at 12.27.27 PM

Plans are underway to build a separated bike/pedestrian path on the upper deck of the Richmond-San Rafael Bridge. As part of a four-year Metropolitan Transportation Authority (MTC) pilot project, the shoulders on the upper and lower decks of the bridge will be converted to a bike/pedestrian path and a traffic lane, respectively. The bike/pedestrian path […]

RIchmond Bridge Bike and Pedestrian Path

Plans are underway to build a separated bike/pedestrian path on the upper deck of the Richmond-San Rafael Bridge. As part of a four-year Metropolitan Transportation Authority (MTC) pilot project, the shoulders on the upper and lower decks of the bridge will be converted to a bike/pedestrian path and a traffic lane, respectively. The bike/pedestrian path […]