Olympic Corridor Trail Connector Study (2013) | 511 Contra Costa

Olympic Corridor Trail Connector Study (2013)

Contra Costa County, together with the cities of Lafayette and Walnut Creek are conducting a planning study to examine a preferred alignment for a feasible alignment and a preferred alternative for a pedestrian/bicycle facility from the Lafayette-Moraga Trail to the Iron Horse Trail in downtown Walnut Creek.  Review the study area map.
The first Community Workshop will be held  Thursday, December 5 at 6:30 p.m. in Walnut Creek.
6:30-8:30 pm
Multi-Purpose Room
Parkmead Elementary
1920 Magnolia Way
Walnut Creek, CA 94595
[google map]

The specific purpose of the Community Workshop is to capture community ideas about the preferred alternative and the criteria that will be used to select the recommended alignment.
After the Community Workshop a preferred alternative will be selected, designed and studied for feasibility and cost.  A second Community Workshop will be held to present the conceptual drawings and design elements for Preferred Trail Alternative and to receive comments.  Public comments will be incorporated into the Final Study Report.